Aberdeen Aquatic Centre Revisited
18th March 2022
The specification included the award winning Cabrillant shower cubicles, plus the versatile, durable Marathon range of cubicles and lockers. The locker doors are manufactured from toughened and laminated glass, which allowed the architect to incorporate quality normally associated with high-end health clubs without compromising safety of use within this heavy traffic public facility.
The colour scheme is striking and modern thanks to the use of vibrant green and graphite grey laminates and glass. Quartz black Corian solid surfacing, for the vanity and grooming shelves, provides the finishing touch.
Find out more at https://www.prospec.co.uk/case-study-aberdeen-aquatic-centre.html #prospec #leisure #marathon #cabrillant #cubicles #lockers
Other Articles
Prospec Is Attending The Physical Activity Facilities Forum 2026 In Scotland
12th March 2026
Onsite Visit Mid Installation at Cambridge Facility
10th March 2026
The New Epping Leisure Centre Has Officially Opened
04th March 2026
Lockmeadow Health Club Updated With Marathon Lockers & Cubicles
06th February 2026
Marathon Washroom Refurbishment For Active Northumberland
02nd June 2025
Prospec Vanity Units & Shelf Ranges Built To Last
08th May 2025
Marathon Lockers Refresh In Glastonbury
01st May 2025
Prospec Are Attending The HE Estates Forum 8th & 9th May 2025 At The Belfry In Sutton Coldfield
30th April 2025
Prospec Attend The Active Wellbeing In Communities Event In Wales
10th April 2025
Prospec Are Attending The Physical Activity Facilities Forum In Scotland
12th March 2025