Lockers & Cubicles Installed At A High Tech Manufacturing Facility
29th July 2022
Another snag free install including our Club cubicles, duct panel bays, vanities and lockers ranges within a new build construction project for a high tech manufacturing facility.
Our locker and cubicle systems are available in a range of options which are perfect for a work environment where manufacturing and production facilities require changing facilities for their workforce. The Prospec Club range provides the perfect cubicle solution for this type of installation.
#prospec #leisure #marathon #cubicles #lockers
Other Articles
Prospec Updates NBS Source Listing To Enhance Product Information For Specifiers
02nd June 2026
A Really Insightful Couple Of Days Attending The IAKS UK & Ireland Conference 2026
19th May 2026
Kenilworth Leisure Centre Project Completed
18th May 2026
Prospec Partnering With IAKS At The Building A Legacy Conference 14th May 2026
12th May 2026
Gym & Leisure Facilities Surveyed At The Palace Of Westminster
11th May 2026
Prospec Is Attending The Sustainable Buildings & Estates Forum 7th May 2026 At The Slate Warwick Conferences
06th May 2026
Prospec Is Attending The HE Estates Forum 7th May 2026 At The Slate Warwick Conferences
05th May 2026
Classic Cubicles & Marathon Lockers Village Refresh
29th April 2026
Classic Beach Huts Using External Grade SGL
02nd April 2026
A Tremendous Couple Of Days At The PAF Forum 2026 In Scotland
23rd March 2026